Current through 2024-51, December 18, 2024
Section 407-63-3 - Report ContentA. Each report shall include the following information:1. a description of the project;2. the need for the project;3. the purpose of the project;4. construction plans and specifications along with any data providing the basis for the engineering design;5. estimated costs and evidence that the most economical methods have been chosen;6. proposed method(s) of financing to include source of funds, interest rates and proposed terms of borrowing;7. such other information as the Commission may deem necessary.65- 407 C.M.R. ch. 63, § 3