65- 407 C.M.R. ch. 319, § 2

Current through 2024-51, December 18, 2024
Section 407-319-2 - DEFINITIONS
A.Commission. "Commission" means the Maine Public Utilities Commission.
B.Controlling load forecast. "Controlling load forecast" means the load forecast currently used by the transmission and distribution utilities for transmission and distribution planning purposes.
C.Cost-effective. "Cost-effective" with respect to nonwires alternativeshas the same meaning as in Title 35-A, section 3131, subsection 8.
D.Nontransmission alternative. "Nontransmission alternative" has the same meaning as in Title 35-A, section 3131, subsection 4-B .
E.Nonwires alternative. "Nonwires alternative" has the same meaning as in Title 35-A, section 3131, subsection 4-C .
F.Nonwires alternatives coordinator. "Nonwires alternatives coordinator" has the same meaning as in Title 35-A, section 3131, subsection 4-D.
G.Small transmission project. "Small transmission project" has the same meaning as in Title 35-A, section 3132-B .

65- 407 C.M.R. ch. 319, § 2