Length Overall x Extreme Breadth x Moulded Depth / 10,000 (all measurements are in feet).
Vessel measurements will be based on the data listed in the most recent edition of classification society records.
The pilot unit depth in this area is to include protrusions beneath the base line, thus reflecting the navigational hazard presented by such protrusions.
Rate Calculation | Effective October 1, 2024 | Effective January 1, 2025 |
Per pilot unit (each way) | $15.14 | $15.14 |
Launch hire (if needed) is charged at $400.00 each way.
Rate Calculation | Effective |
$14.00 per pilot unit; minimum 200 pilot units (each way) | October 1, 2024 |
$15.00 per pilot unit; minimum 250 pilot units (each way) | January 1, 2025 |
For shifting within the above-named Pilotage Zones: 50% of the inbound rate.
Rate Calculation | Effective October 1, 2024 | Effective January 1, 2025 |
First 100 pilot units (each way) | $3066 | $3158 |
plus per pilot unit above 100 (each way) | $7.06 | $7.27 |
Rate Calculation | Effective October 1, 2024 | Effective January 1, 2025 |
First 100 pilot units (each way) | $5212 | $5369 |
plus per pilot unit above 100 (each way) | $12.00 | $12.36 |
Rate Calculation | Effective October 1, 2024 | Effective January 1, 2025 |
First 100 pilot units (each way) | $6132 | $6316 |
plus per pilot unit above 100 (each way) | $14.12 | $14.54 |
The rate for a United States flag, United States crewed fast ferry less than 9,000 Gross Tons on regularly scheduled service between Bar Harbor, ME and Yarmouth, NS shall be per the table contained in paragraph (2) below.
Rate Calculation | Effective |
$8.75 per pilot unit; minimum 141 pilot units (each way) | October 1, 2024 |
$9.00 per pilot unit; minimum 141 pilot units (each way) | January 1, 2025 |
A Training, Technology and Capital Construction Fee of $300 will be assessed to each vessel upon arrival only (effective October 1, 2024).
Length Overall x Extreme Breadth x Moulded Depth / 10,000 (all measurements are in feet).
Vessel measurements will be based on the data listed in the most recent edition of classification society records.
Rate Calculation | Effective October 1, 2024 | Effective January 1, 2025 |
Per pilot unit (each way) | $9.50 | $9.50 |
17-387 C.M.R. ch. 2, § 03