The ESRD Facility must meet all Medicare certification requirements.
All ESRD Facilities are required to have a back-up emergency generator. The emergency generator must be made operational for a period of at least one-half (1/12) hour each month with documentation of date and time of operation.
10- 144 C.M.R. ch. 126, § 5.I