C.M.R. 06, 096, ch. 524, § 096-524-6, subsec. 096-524-6-V

Current through 2024-51, December 18, 2024
Subsection 096-524-6-V - Best management practices programs
(a) BMP programs shall be developed in accordance with good engineering practices and with the provisions of this section.
(b) The BMP program shall:
(1) Be documented in narrative form, and shall include any necessary plot plans, drawings or maps;
(2) Establish specific objectives for the control of toxic and hazardous pollutants.
(i) Each facility component or system shall be examined for its potential for causing a release of significant amounts of toxic or hazardous pollutants to waters of the State due to equipment failure, improper operation, natural phenomena such as rain or snowfall, etc.
(ii) Where experience indicates a reasonable potential for equipment failure (e.g., a tank overflow or leakage), natural condition (e.g., precipitation), or other circumstances to result in significant amounts of toxic or hazardous pollutants reaching surface waters, the program should include a prediction of the direction, rate of flow and total quantity of toxic or hazardous pollutants which could be discharged from the facility as a result of each condition or circumstance;
(3) Establish specific best management practices to meet the objectives identified under paragraph (b)(2) of this section, addressing each component or system capable of causing a release of significant amounts of toxic or hazardous pollutants to the waters of the State;
(4) The BMP program: (i) May reflect requirements for Spill Prevention Control and Countermeasure (SPCC) plans under section 311 of the Act and 40 CFR part 151, and may incorporate any part of such plans into the BMP program by reference;

[Comment: EPA has proposed section 311(j)(1)(c) regulations (43 FR 39276) which require facilities subject to NPDES to develop and implement SPCC plans to prevent discharges of reportable quantities of designated hazardous substances. While subpart K requires only procedural activities and minor construction, the proposed 40 CFR part 151 (SPCC regulations) are more stringent and comprehensive with respect to their requirements for spill prevention. In developing BMP programs in accordance with subpart K, owners or operators should also consider the requirements of proposed 40 CFR part 151 which may address many of the same areas of the facility covered by this section.]

(ii) Shall assure the proper management of solid and hazardous waste in accordance with regulations promulgated under the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act of 1976 (RCRA) ( 40 U.S.C. 6901 et seq.). Management practices required under RCRA regulations shall be expressly incorporated into the BMP program; and
(iii) Shall address the following points for the ancillary activities in Subsection III of this section:
(A) Statement of policy;
(B) Spill Control Committee;
(C) Material inventory;
(D) Material compatibility;
(E) Employee training:
(F) Reporting and notification procedures;
(G) Visual inspections;
(H) Preventive maintenance;
(I) Housekeeping; and
(J) Security.

[Comment: Additional technical information on BMPs and the elements of a BMP program is contained in publication entitled ``Guidance Manual for Developing Best Management Practices (BMP).'' Copies may be obtained by written request to the Office of Water Resource Center (mail code: 4100), Environmental Protection Agency, Washington, DC 20460].

(c)
(1) The BMP program must be clearly described and submitted as part of the permit application. An application which does not contain a BMP program shall be considered incomplete. Upon receipt of the application, the Department shall approve or modify the program in accordance with the requirements of this section. The BMP program as approved or modified shall be included in the draft permit (Chapter 522). The BMP program shall be subject to the applicable permit issuance requirements of Chapter 522, resulting in the incorporation of the program (including any modifications of the program resulting from the permit issuance procedures) into the final permit.
(2) Proposed modifications to the BMP program which affect the discharger's permit obligations shall be submitted to the Department for approval. If the Department approves the proposed BMP program modification, the permit shall be modified in accordance with Chapter 522, provided that the Department may waive the requirements for public notice and opportunity for hearing on such modification if it determines that the modification is not significant. The BMP program, or modification thereof, shall be fully implemented as soon as possible but not later than one year after permit issuance, modification, or revocation and reissuance unless the Department specifies a later date in the permit.

Note: A later date may be specified in the permit, for example, to enable coordinated preparation of the BMP program required under these regulations and the SPCC plan required under 40 CFR part 151 or to allow for the completion of construction projects related to the facility's BMP or SPCC program.

(d) The discharger shall maintain a description of the BMP program at the facility and shall make the description available to the Department upon request.
(e) The owner or operator of a facility subject to this subpart shall amend the BMP program in accordance with the provisions of this section whenever there is a change in facility design, construction, operation, or maintenance which materially affects the facility's potential for discharge of significant amounts of hazardous or toxic pollutants into the waters of the State.
(f) If the BMP program proves to be ineffective in achieving the general objective of preventing the release of significant amounts of toxic or hazardous pollutants to those waters and the specific objectives and requirements under paragraph (b) of this subsection, the permit and/or the BMP program shall be subject to modification to incorporate revised BMP requirements.

C.M.R. 06, 096, ch. 524, § 096-524-6, subsec. 096-524-6-V