The manufacturer must be consulted to determine whether the welding of a heat exchanger is sound engineering practice. The manufacturer must provide a written statement as to the feasibility of its heat exchanger being welded. If the heat exchanger is no longer in production, a master licensee must make a written request to the Board and obtain written approval from the Board before the repair is undertaken.
The repair of a heat exchanger by welding must be performed by a welder in a procedure suitable for the material. A master licensee must oversee such repairs. The master licensee must receive guidance from the welder as to the feasibility and acceptability of performing the welding procedure of the metals prior to the repair of any heat exchanger. After completion of said repairs or welding, the master licensee must obtain a written statement from the welder documenting that the heat exchanger has been welded, tested and is acceptable for use without leakage of flue gases.
Written documentation of said repairs or welding must be provided to the owner. The original documentation must be kept on file by the master licensee who requested the welding. A copy of all the repair documents containing, at a minimum, the following information must be sent to the Board:
Welding repair of a heat exchanger may be performed only once. A subsequent welding repair shall not be made to a heat exchanger unless a master licensee makes written request to the Board and obtains written approval from the Board before the repair is undertaken.
02-658 C.M.R. ch. 8, § 22