02-658-8 Me. Code R. § 16

Current through 2024-51, December 18, 2024
Section 658-8-16 - Use of Priority Controls

A priority control for installation of an oil-fired warm air furnace and an oil-fired hot water heater when the existing chimney flue is not of adequate size to accommodate both appliances is allowed. The chimney must be lined. A priority control is required when replacing an existing furnace or water heater when the chimney is not properly sized for both appliances.

02-658 C.M.R. ch. 8, § 16