All joints and seams in exterior wall coverings that were disturbed during location of the home must be made weatherproof.
The home manufacturer must provide materials and designs for mate-line gaskets or other methods designed to resist the entry of air, water, water vapor, insects, and rodents at all mate-line locations exposed to the exterior (See Figure B to this section.)
Hinged roofs and eaves must be completed during installation in compliance with all requirements of the MHCSS (24 CFR part 3280) and the MHPER(24 CFR part 3282). Unless exempted by the following provisions, -hinged roofs are also subject to a final inspection for compliance with the MHCSS (24 CFR part 3280) by the IPIA or a qualified independent inspector acceptable to the IPIA.Homes with hinged roofs that are exempted from IPIA inspection are instead to be completed and inspected in accordance with the Manufactured Home Installation Program (24 CFR part 3286).This includes homes:
Figure A to Subchapter I, Section I - Exterior Close-up
Installation of Field-Applied Horizontal Lap Siding
Notes to Figure A:
Figure B to Subchapter I, Section I - Exterior Close-up
Note to Figure B:
On multi-section manufactured homes, install the sealer gasket on the ceiling, end walls, and floor mate-line prior to joining the sections together.
02- 385 C.M.R. ch. 890, § I-I