02-385-890 Me. Code R. § C-I

Current through 2024-51, December 18, 2024
Section 385-890-C-I - Soil Conditions

To help prevent settling or sagging, the foundation must be constructed on firm, undisturbed soil or fill compacted to at least 90 percent of its maximum relative density.All organic material such as grass, roots, twigs, and wood scraps must be removed in areas where footings are to be placed.After removal of organic material, the home site must be graded or otherwise prepared to ensure adequate drainage, in accordance with Subchapter C, Section III. Homes shall not be installed on uncontrolled fill.

02-385 C.M.R. ch. 890, § C-I