In determining whether or not significant resource values identified by the Maine Rivers Study will be diminished, the Administering Agency shall not consider measures proposed to replace or substitute for losses.
For the purposes of this rule, an "existing dam on an outstanding river segment" shall mean a man-made barrier across any outstanding river segment identified in 12 M.R.S. §403, which impounds water, and which, as of September 23, 1983, had not been breached, deteriorated, or modified to the point where it no longer impounded water at or near its design level at normal flows.
For the purposes of this rule, "additional development or redevelopment of an existing dam on an outstanding river segment" shall mean any activities associated with the installation, reinstallation, or expansion of any hydroelectric or hydromechanical generating capacity at an existing dam on an outstanding river segment as defined above, that does not result in any increase in water levels above the dam or any dewatering of the outstanding river segment below the dam except during construction.
01- 672 C.M.R. ch. 11, § 4