Current through Register Vol. 50, No. 11, November 20, 2024
Section IX-317 - Project Priority Rating SystemA. There are four categories of evaluation. The categories are as follows: 1. Category I-project type;2. Category II-facility usage;3. Category III-sponsor compliance;4. Category IV-special considerations.B. Points are awarded to a project based on evaluation criteria in each category, and the total evaluation score for the project is the sum of the points in each category. The point values are designed to award points in a weighted manner. Each area of evaluation receives points in proportion to the relative importance as determined by DOTD.La. Admin. Code tit. 70, § IX-317
Promulgated by the Department of Transportation and Development, Division of Aviation, LR 16:538 (June 1990), amended LR 24:1510 (August 1998), amended by the Department of Transportation and Development, Intermodal Transportation Division, LR 33:524 (March 2007), repromulgated by the Department of Transportation and Development, Aviation Section, LR 39:109 (January 2013), Amended by the Department of Transportation and Development, Intermodal Transportation Division, Aviation Section, LR 42760 (5/1/2016), Amended by the Department of Transportation and Development, Office of Multimodal Commerce, LR 491422 (8/1/2023).AUTHORITY NOTE: Promulgated in accordance with USC 49:47101 through 49: 47107, USC 49:48103, SCR 67 (1997), R.S. 2:6, and R.S. 2:802.