Section II-1923 - Insertion Pits
A. The location and number of insertion pits shall be planned by the permittee and submitted in writing for approval by the DOTD prior to excavation.
B. The pits shall be located in a manner that their total number shall be minimized and the length of replacement pipe installed in a single pull shall be maximized.
C. Repairs under the roadway will not be allowed if it necessitates open cutting the roadway. If difficulty with the crossing is experienced, the utility company must install and bear the total cost of a new crossing.

La. Admin. Code tit. 70, § II-1923

Promulgated by the Department of Transportation and Development, Office of Highways/Engineering, LR 31:107 (January 2005).