La. Admin. Code tit. 56 § III-319

Current through Register Vol. 50, No. 11, November 20, 2024
Section III-319 - Distribution of Funds
A. Maximum Statewide Flood Control Program participation is $5,000,000 per project, unless the secretary of DOTD authorizes a project to be undertaken in excess of $5,000,000 due to the receipt of one-time funds.
B. The distribution of program funds is based on a two-tiered system consisting of:
1.
a. the eleven major urban areas in Louisiana as shown in Figure 1 (§301); and,
b. the five funding districts shown in Figure 2 (§303);
2. 45 percent of total program funds is allocated to project areas within the eleven designated urban areas as shown in Figure 1 (§301). Projects within urban areas must compete for funding with projects from all urban areas. Urban funding shall be distributed evenly among urban jurisdictions with outstanding funding obligations;
3. 55 percent of total program funds is allocated to rural projects in the five funding districts as shown in Figure 2 (§303). The formula for distributing funds among the five districts is as follows:

District's Percent of Available Funding =

[0.50 x (District's Percent of State's Rural Land Area)] + [0.50 x (District's Percent of State's Rural Population)]

4. The following table presents the funding allocation percentage for each of the five districts.

Table 1 Funding Allocations for Rural Projects by Funding District

Funding District

Percent of State Total

Rural Land Area

Rural Population

Funding Allocation

Northwest

28.589

25.745

27.167

Northeast

19.644

13.948

16.796

Southwest

18.199

18.537

18.368

South Central

16.907

22.824

19.866

Southeast

16.661

18.964

17.803

State Total

100.0

100.0

100.0

5. The total annual funding provided to projects under the Rural Grant Opportunity Program shall not exceed 25 percent of the total annual funding provided to the Statewide Flood Control Program.
C. The Evaluation Committee will make its recommendations for projects within the limitations of the funding projections for the coming year and in accordance with the distributions presented in Table 1 of this Chapter. Table 2 of this Chapter presents the funding distribution for a hypothetical $50 million construction program allocation.

La. Admin. Code tit. 56, § III-319

Promulgated by the Department of Transportation and Development, Office of Public Works, LR 5:577 (May 1985), repromulgated by the Department of Transportation and Development, Office of Public Works, LR 31:942 (April 2005), amended LR 35:2854 (December 2009), Amended by the Department of Transportation and Development, Office of Engineering, LR 461239 (9/1/2020).

AUTHORITY NOTE: Promulgated in accordance with R.S. 38:90.1 et. seq.