Current through Register Vol. 50, No. 11, November 20, 2024
Section XII-143 - Facility Water SupplyA. The water treatment plants service connection line and the finished water sample tap line shall both be supplied from a source of finished water at a point where all chemicals have been thoroughly mixed, and the required disinfectant contact time has been achieved (see §179. C of this Part).B. In some cases the take off point of the water treatment plants own service connection line and the finished water sample tap line may be downstream of the plant itself but at or before the first customer.C. There shall be no cross-connections between the water treatment plants service connection line or the finished water sample tap line and any piping, troughs, tanks, or other treatment units containing wastewater, treatment chemicals, raw or partially treated water.La. Admin. Code tit. 51, § XII-143
Promulgated by the Department of Health, Office of Public Health, LR 44302 (2/1/2018), effective 8/1/2018.AUTHORITY NOTE: Promulgated in accordance with the provisions of R.S. 40:4.A.(8), 40:4.13.D.(1)(2) and 40:5.A.(2)(3)(5)(6)(7)(17).