Current through Register Vol. 50, No. 11, November 20, 2024
Section XV-5385 - Coal Processing Waste: Burned Waste UtilizationA. Before any burned coal processing waste, other materials or refuse is removed from a disposal area, approval shall be obtained from the office. A plan for the method of removal, with maps and appropriate drawings to illustrate the proposed sequence of the operation and method of compliance with this Chapter, shall be submitted to the office. Consideration shall be given in the plan to potential hazards which may be created by removal to persons working or living in the vicinity of the structure. The plan shall be certified by a qualified engineer.La. Admin. Code tit. 43, § XV-5385
Promulgated by the Department of Natural Resources, Office of Conservation, LR 5:395 (December 1979), amended LR 14:441 (July 1988), LR 20:447 (April 1994).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:901-932.