La. Admin. Code tit. 43 § XIII-2915

Current through Register Vol. 50, No. 11, November 20, 2024
Section XIII-2915 - Transmission Lines: Permanent Field Repair of Welds [49 CFR 192.715]
A. Each weld that is unacceptable under §1321(c) must be repaired as follows. [ 49 CFR 192.715]
1. If it is feasible to take the segment of transmission line out of service, the weld must be repaired in accordance with the applicable requirements of §1325 [ 49 CFR 192.715(a)]
2. A weld may be repaired in accordance with §1325 while the segment of transmission line is in service if: [ 49 CFR 192.715(b)]
a. the weld is not leaking; [ 49 CFR 192.715(b)(1)]
b. the pressure in the segment is reduced so that it does not produce a stress that is more than 20 percent of the SMYS of the pipe; and [ 49 CFR 192.715(b)(2)]
c. grinding of the defective area can be limited so that at least 1/8 inch (3.2 millimeters) thickness in the pipe weld remains. [ 49 CFR 192.715(b)(3)]
3. A defective weld which cannot be repaired in accordance with Paragraph 1 or 2 of this Section must be repaired by installing a full encirclement welded split sleeve of appropriate design. [ 49 CFR 192.715(c)]

La. Admin. Code tit. 43, § XIII-2915

Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:245 (April 1983), amended LR 10:537 (July 1984), LR 27:1548 (September 2001), LR 30:1268 (June 2004).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.