Current through Register Vol. 50, No. 11, November 20, 2024
Section XIII-1301 - Scope [49 CFR 192.221]A. This Chapter prescribes minimum requirements for welding steel materials in pipelines. [ 49 CFR 192.221(a)]B. This Chapter does not apply to welding that occurs during the manufacture of steel pipe or steel pipeline components. [ 49 CFR 192.221(b)]La. Admin. Code tit. 43, § XIII-1301
Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:228 (April 1983), amended LR 10:521 (July 1984), LR 30:1241 (June 2004).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.