Current through Register Vol. 50, No. 9, September 20, 2024
Section III-2131 - Time Table for ConstructionA. The timetable for construction shall be approved by the board and monitored for compliance by the division.B. All riverboat licenses shall be subject to the condition that within 24 months from the date the license is granted the riverboat shall commence gaming operations. Upon the recommendation of the division, an extension of time may be granted.La. Admin. Code tit. 42, § III-2131
Promulgated by the Department of Public Safety and Corrections, Gaming Control Board, LR 38:1615 (July 2012).AUTHORITY NOTE: Promulgated in accordance with R.S. 27:15 and 24.