Current through Register Vol. 50, No. 11, November 20, 2024
Section III-193 - Technical Proposal-Evaluation CommitteeA. The Director of Facility Planning and Control for projects administered by that agency or the equivalent agency head for other agencies shall establish a technical review committee for evaluation of design-build proposals. The technical review committee shall consist of at least three but no more than five building construction professionals with expertise in diverse fields of the construction industry including at least one design professional and one contractor. At least one of the members shall be from the private sector and at least one shall be from the public sector.B. The technical review committee may select additional agency engineering and technical experts, and nationally recognized design-build experts to serve as committee members to score each technical element of the project.C. The technical review committee shall identify specific technical elements of the project, based on the specific requirements of the technical proposal and depending on the characteristics of the project, to be included in the technical score.D. Members of the technical review committee shall not have served as members of the qualifications evaluation committee.E. Each member of the technical review committee shall make his scoring of assigned elements available for public review. Such scores shall be considered public record. The public agency shall make all scores available to the public simultaneously.F. The price shall not be opened until the appeal period defined in §195 is passed.La. Admin. Code tit. 34, § III-193
Promulgated by the Office of the Governor, Division of Administration, Office of Facility Planning and Control, LR 34:2124 (October 2008).AUTHORITY NOTE: Promulgated in accordance with R.S. 39:121 and RS 38:2225.2.1.