Current through Register Vol. 50, No. 11, November 20, 2024
Section XI-1301 - ApplicabilityA. The requirements of this Chapter apply to persons engaged in critical junctures of a UST system. Certification is not required for those persons engaged in the process of relining an underground storage tank through the application of such materials as epoxy resins, nor does it include the process of conducting a tightness test to establish the integrity of the tank, or installing or initial testing of UST system cathodic protection systems.B. After January 20, 1992, no person shall conduct critical junctures of a UST system unless the person present at the site and exercising responsible supervisory control over the critical juncture is currently certified in accordance with this Chapter.La. Admin. Code tit. 33, § XI-1301
Promulgated by the Department of Environmental Quality, Office of Solid and Hazardous Waste, Underground Storage Division, LR 16:614 (July 1990), amended LR 17:658 (July 1991), amended by the Office of Environmental Assessment, LR 31:1074 (May 2005).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2001 et seq.