Current through Register Vol. 50, No. 11, November 20, 2024
Section V-30266 - Construction Records [49 CFR 195.266]A. A complete record that shows the following must be maintained by the operator involved for the life of each pipeline facility: [ 49 CFR 195.266] 1. the total number of girth welds and the number nondestructively tested, including the number rejected and the disposition of each rejected weld; [ 49 CFR 195.266(a)] 2. the amount, location, and cover of each size of pipe installed; [ 49 CFR 195.266(b)] 3. the location of each crossing of another pipeline; [ 49 CFR 195.266(c)] 4. the location of each buried utility crossing; [ 49 CFR 195.266(d)] 5. the location of each overhead crossing; [ 49 CFR 195.266(e)] 6. the location of each valve and corrosion test station. [ 49 CFR 195.266(f)] 7. for pipelines transporting carbon dioxide, the location of each weighted pipe or other item connected to the pipe.La. Admin. Code tit. 33, § V-30266
Promulgated by the Department of Natural Resources, Office of Conservation, Pipeline Division, LR 29:2822 (December 2003), Amended LR 49910 (5/1/2023).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:753.