La. Admin. Code tit. 33 § V-3511

Current through Register Vol. 50, No. 11, November 20, 2024
Section V-3511 - Closure Plan; Amendment of Plan
A. Written Plan
1. The owner or operator of a hazardous waste management facility must have a written closure plan. In addition, certain surface impoundments and waste piles from which the owner or operator intends to remove or decontaminate the hazardous waste at partial or final closure are required by LAC 33:V.2911.D and 2315.C to have contingent closure plans. The plan must be submitted with the permit application, in accordance with LAC 33:V.517.M and approved by the administrative authority as part of the permit issuance procedures under LAC 33:V.Chapters 3 and 7. In accordance with LAC 33:V.311, the approved closure plan will become a condition of any hazardous waste permit.
2. The administrative authority's approval of the plan must ensure that the approved closure plan is consistent with LAC 33:V.3507, 3511-3517, and the applicable requirements of LAC 33:V.Chapter 33, 1803, 1911, 1915, 2117, 2315, 2521, 2719, 2911, 3121, and 3203. Until final closure is completed and certified in accordance with LAC 33:V.3517, a copy of the approved plan and all approved revisions must be furnished to the administrative authority upon request, including request by mail.
B. Content of Plan. The plan must identify steps necessary to perform partial and/or final closure of the facility at any point during its active life. The closure plan must include, at least:
1. a description of how each hazardous waste management unit at the facility will be closed in accordance with LAC 33:V.3507;
2. a description of how final closure of the facility will be conducted in accordance with LAC 33:V.3507. The description must identify the maximum extent of the operations which will be unclosed during the active life of the facility; and
3. an estimate of the maximum inventory of hazardous wastes ever on-site over the active life of the facility and a detailed description of the methods to be used during partial closures and final closure, including, but not limited to, methods for removing, transporting, treating, storing, or disposing of all hazardous wastes, and identification of the type(s) of the off-site hazardous waste management units to be used, if applicable; and
4. a detailed description of the steps needed to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during partial and final closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard;
5. a detailed description of other activities necessary during the closure period to ensure that all partial closures and final closure satisfy the closure performance standards, including, but not limited to, groundwater monitoring, leachate collection, and run-on and run-off control;
6. a schedule for closure of each hazardous waste management unit and for final closure of the facility. The schedule must include, at a minimum, the total time required to close each hazardous waste management unit and the time required for intervening closure activities which will allow tracking of the progress of partial and final closure (for example, in the case of a landfill, unit estimates of the time required to treat or dispose of all hazardous waste inventory and of the time required to place a final cover must be included); and
7. for facilities that use trust funds to establish financial assurance LAC 33:V.3707 and 3711 and that are expected to close prior to the expiration of the permit, an estimate of the expected year of final closure ; and
8. for facilities where the administrative authority has applied alternative requirements at a regulated unit under LAC 33:V.3301.G, 3501.D, and/or 3701.D, either the alternative requirements applying to the regulated unit or a reference to the enforceable document containing those alternative requirements.
C. Amendment of Plan. The owner or operator must submit to the Office of Environmental Services a written notification of or request for a permit modification to authorize a change in operating plans, facility design, or the approved closure plan in accordance with the applicable procedures in LAC 33:V.Chapters 3 and 7. The written notification or request must include a copy of the amended closure plan for review or approval by the administrative authority.
1. The owner or operator may submit a written notification or request to the Office of Environmental Services for a permit modification to amend the closure plan at any time prior to the notification of partial or final closure of the facility.
2. The owner or operator must submit a written notification of or request for a permit modification to authorize a change in the approved closure plan whenever:
a. changes in operating plans or facility design affect the closure plan; or
b. there is a change in the expected year of closure, if applicable; or
c. in conducting partial or final closure activities, unexpected events require a modification of the approved closure plan; or
d. the owner or operator requests the administrative authority to apply alternative requirements to a regulated unit under LAC 33:V.3301.G, 3501.D, and/or 3701.D.
3. The owner or operator must submit to the Office of Environmental Services a written request for a permit modification including a copy of the amended closure plan for approval at least 60 days prior to the proposed change in facility design or operation, or no later than 60 days after an unexpected event has occurred that has affected the closure plan. If an unexpected event occurs during the partial or final closure period, the owner or operator must request a permit modification no later than 30 days after the unexpected event. An owner or operator of a surface impoundment or waste pile that intends to remove all hazardous waste at closure and is not otherwise required to prepare a contingent closure plan under LAC 33:V.2911.D or 2315.D must submit an amended closure plan to the Office of Environmental Services no later than 60 days from the date that the owner or operator or administrative authority determines that the hazardous waste management unit must be closed as a landfill, subject to the requirements of LAC 33:V.2521, or no later than 30 days from that date if the determination is made during partial closure or final closure. The administrative authority will approve, disapprove, or modify this amended plan in accordance with the procedures in LAC 33:V.Chapters 3 and 7. In accordance with LAC 33:V.311, the approved closure plan will become a condition of any hazardous waste permit issued.
4. The administrative authority may request modifications to the plan under the conditions described in LAC 33:V.3511.A.2. The owner or operator must submit the modified plan within 60 days of the administrative authority's request, or within 30 days if the change in facility conditions occurs during partial or final closure. Any modifications requested by the administrative authority will be approved in LAC 33:V.Chapters 3 and 7.
5. Repealed.
D. Notification of Partial Closure and Final Closure
1. The owner or operator must notify the Office of Environmental Services in writing at least 60 days prior to the date on which he expects to begin closure of a surface impoundment, waste pile, land treatment or landfill unit, or final closure of a facility with such a unit. The owner or operator must notify the Office of Environmental Services in writing at least 45 days prior to the date on which he expects to begin final closure of a facility with only treatment or storage tanks, container storage, or incinerator units to be closed. The owner or operator must notify the Office of Environmental Services in writing at least 45 days prior to the date on which he expects to begin partial or final closure of a boiler or industrial furnace, whichever is earlier.
2. The date when he or she "expects to begin closure" must be one of the following:
a. no later than 30 days after the date on which any hazardous waste management unit receives the known final volume of hazardous wastes or, if there is a reasonable possibility that the hazardous waste management unit will receive additional hazardous wastes, no later than one year after the date on which the unit received the most recent volume of hazardous waste. If the owner or operator of a hazardous waste management unit can demonstrate to the administrative authority that the hazardous waste management unit or facility has the capacity to receive additional hazardous wastes and he or she has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all applicable permit requirements, the administrative authority may approve an extension to this one-year limit;
b. for units meeting the requirements of LAC 33:V.3513.D, no later than 30 days after the date on which the hazardous waste management unit receives the known final volume of non-hazardous wastes, or if there is a reasonable possibility that the hazardous waste management unit will receive additional non-hazardous wastes, no later than one year after the date on which the unit received the most recent volume of non-hazardous wastes. If the owner or operator can demonstrate to the administrative authority that the hazardous waste management unit has the capacity to receive additional non-hazardous wastes and he or she has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all applicable permit requirements, the administrative authority may approve an extension to this one-year limit.
3. If the facility's permit is terminated, or if the facility is otherwise ordered, by judicial decree or final order under R.S. 30:2025, to cease receiving hazardous wastes or to close, then the requirements of this Paragraph do not apply. However, the owner or operator must close the facility in accordance with the deadlines established in LAC 33:V.3513.
E. Removal of Wastes and Decontamination or Dismantling of Equipment. Nothing in this Section shall preclude the owner or operator from removing hazardous wastes and decontaminating or dismantling equipment in accordance with the approved partial or final closure plan at any time before or after notification of partial or final closure.

La. Admin. Code tit. 33, § V-3511

Promulgated by the Department of Environmental Quality, Office of Solid and Hazardous Waste, Hazardous Waste Division, LR 10:200 (March 1984), amended LR 13:433 (August 1987), LR 14:791 (November 1988), LR 16:399 (May 1990), LR 16:614 (July 1990), LR 17:478 (May 1991), LR 18:1256 (November 1992), LR 18:1375 (December 1992), LR 21:266 (March 1995), amended by the Office of Waste Services, Hazardous Waste Division, LR 25:480 (March 1999), amended by the Office of Environmental Assessment, Environmental Planning Division, LR 26:2486 (November 2000), amended by the Office of the Secretary, Legal Affairs Division, LR 31:2465 (October 2005), LR 33:2116 (October 2007), Amended by the Office of the Secretary, Legal Division, LR 431145 (6/1/2017).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2001 et. seq., and specifically R.S. 30:2180 et seq.