Current through Register Vol. 50, No. 9, September 20, 2024
Section I-5107 - Deficiencies Identified during On-Site InspectionA. Whenever deviations or deficiencies are found during an inspection, documentation of same will be included in the written report as required in LAC 33:I.5101.E.7. The laboratory representatives (or designees) will be asked to attest to (sign) receipt of the on-site inspection form and review same with the representative of the department conducting the inspection. The laboratory shall have a period of 30 calendar days from date of receipt of the laboratory inspection report in which to respond to the deficiencies reported and submit a plan for correcting all identified deficiencies. If the laboratory fails to respond, the accreditation process will terminate and the laboratory will be considered as nonaccredited.B. The laboratory shall correct any deficiencies or deviations within six months from the date of receipt of the inspection report. If deficiencies affecting the accuracy of results are found, the accreditation shall be immediately suspended or revoked.La. Admin. Code tit. 33, § I-5107
Promulgated by the Department of Environmental Quality, Office of the Secretary, LR 24:924 (May 1998).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2011.