405 Ky. Admin. Regs. 18:020

Current through Register Vol. 51, No. 5, November 1, 2024
Section 405 KAR 18:020 - Contemporaneous reclamation

RELATES TO: KRS 350.093, 350.100, 350.151, 350.405, 350.465

NECESSITY, FUNCTION, AND CONFORMITY: KRS Chapter 350 in pertinent part requires the cabinet to promulgate rules and administrative regulations establishing performance standards for protection of people and property, land, water and other natural resources, and aesthetic values, during underground mining activities and for restoration and reclamation of surface areas affected by underground mining activities. This administrative regulation sets forth general requirements for keeping reclamation operations, including backfilling, grading, soil preparation and revegetation, as contemporaneous as practicable with surface operations of underground mining.

Section 1. Contemporaneous Reclamation. Reclamation operations, including, but not limited to, backfilling, grading, soil preparation and revegetation, of all areas affected by surface operations of underground mining shall occur as contemporaneously as practicable with surface operations.

405 KAR 18:020

8 Ky.R. 1558; eff. 1-6-1983; Crt eff. 7-3-2018.

STATUTORY AUTHORITY: KRS 350.028, 350.151, 350.465