Each utility proposing to build a new electric supply line, or contemplating a change in an existing electric supply line located outside the corporate limits of any city, shall present an application to the commission for approval. The application shall consist of a completed application form as approved by the commission, and any other information required by the form or these regulations including:
On or before the day the application is submitted to the commission, the utility shall send written notice of the proposed construction or changes as required by K.A.R. 82-12-5.
Kan. Admin. Regs. § 82-12-3