For good cause shown by the applicant the chief engineer may grant an extension of time to continue the use of water under a temporary permit beyond the date authorized as shown in the approval of the application. The term of a temporary permit shall not exceed six (6) months including any authorized extension of time thereof.
Kan. Admin. Regs. § 5-9-7