Current through Register Vol. 43, No. 49, December 5, 2024
A temporary permit shall not be granted for a quantity of water in excess of 4,000,000 gallons, except for either of the following:
(a) Dewatering purposes; or(b) water that is to be diverted from a source located on a construction site and used on the construction site in connection with a project that the chief engineer has approved pursuant to K.S.A. 82a-301 through 82a-305a or K.S.A. 24-126, and amendments thereto.Kan. Admin. Regs. § 5-9-3
Authorized by K.S.A. 82a-727b; implementing K.S.A. 82a-727; effective May 1, 1979; amended Dec. 3, 1990; amended June 22, 2012.