Kan. Admin. Regs. § 5-9-1c

Current through Register Vol. 43, No. 49, December 5, 2024
Section 5-9-1c - Request to extend a term permit

Any term permit may be extended as provided in K.A.R 5-9-1b if the request to extend the term permit meets the following requirements:

(a) Is received at least 30 days before the expiration of the term permit;
(b) is signed by the holder of the term permit or its authorized agent;
(c) meets one of the following conditions:
(1) Will extend the total term of the permit for five years or less; or
(2) will extend the total term of the permit in excess of five years, if the application meets the requirements of safe yield, allowable appropriation, and similar regulatory criteria; and
(d) includes all of the following:
(1) Good cause for extension of the term is provided;
(2) approval of the extension will not impair an existing water right or permit;
(3) extension of the term permit will not prejudicially and unreasonably affect the public interest;
(4) the applicant has complied with the terms, conditions, and limitations of the previous term permit; and
(5) the applicant has access to the proposed point of diversion and the proposed place of use.

Kan. Admin. Regs. § 5-9-1c

Authorized by K.S.A. 82a-706a; implementing K.S.A. 82a-706a and 82a-712; effective Oct. 31, 2008.