Kan. Admin. Regs. § 5-8-8

Current through Register Vol. 43, No. 49, December 5, 2024
Section 5-8-8 - Owner required to allow chief engineer to conduct timely field inspection for certification
(a) In order to allow the chief engineer to conduct a timely field inspection to certify a water right, the owner of an approval of application shall perform the following:
(1) Operate the diversion works in the same manner that they were operated when water was applied to beneficial use during the perfection period, so that an accurate rate-of-diversion test can be conducted by the chief engineer;
(2) allow the chief engineer access to the diversion works and the authorized place of use for the purpose of making the field inspection; and
(3) allow, cooperate with, and assist the chief engineer in any other ways necessary for the chief engineer to conduct the field inspection.
(b) The owner of the approval of application shall allow the field inspection to be conducted within 365 days after the chief engineer has sent the owner of the approval of application a restricted letter requesting that the chief engineer be allowed to conduct a field inspection. If the owner does not cooperate with, assist, and allow the chief engineer to conduct a field inspection, without good cause, within one year after the restricted letter is sent by the chief engineer, an order shall be issued by the chief engineer requiring the owner of the approval of application to comply with the terms of the restricted letter. The order shall also be sent by restricted mail. If the owner fails to comply with the order of the chief engineer, an action shall be brought by the chief engineer to enforce the order of the chief engineer pursuant to the act for judicial review, and civil enforcement of agency actions, K.S.A. 77-624 et seq. and amendments thereto.

Kan. Admin. Regs. § 5-8-8

Authorized by K.S.A. 82a-706a; implementing K.S.A. 1999 Supp. 82a-714; effective Sept. 22, 2000.