Except as provided in K.A.R. 5-45-21 and K.A.R. 5-45-22, the prior written approval of the chief engineer shall be required before placing an unconsolidated material storage stockpile in a floodplain or constructing a safety berm in a floodplain.
Kan. Admin. Regs. § 5-45-19