Kan. Admin. Regs. § 5-45-11

Current through Register Vol. 43, No. 49, December 5, 2024
Section 5-45-11 - Levees; freeboard requirements
(a) Levees not within a floodway designated by the chief engineer are required to have the following freeboard:

Design flood frequency Freeboard required

10 years 1 foot

25 years 2 feet

50 years or more 3 feet

Kan. Admin. Regs. § 5-45-11

Authorized by and implementing K.S.A. 24-126; effective May 1, 1987.