Kan. Admin. Regs. § 5-44-3

Current through Register Vol. 43, No. 49, December 5, 2024
Section 5-44-3 - Floodplain management; application for approval of zoning regulations; time limit
(a) The application for approval of zoning regulations shall consist of:
(1) a letter which:
(A) requests approval by the chief engineer under K.S.A. 12-766 on a proposed effective date, which shall not be prior to the approval by the chief engineer;
(B) proposes the date of adoption by the governing body; and
(C) states the reason for application for approval as enumerated in K.A.R. 5-44-2;
(2) a copy of the full text of the zoning regulation including maps, plans, profiles and specifications adopted by the floodplain management zoning regulations which meet the requirements of K.A.R. 5-44-4.
(b) When all the data required by the chief engineer is received, the chief engineer shall notify the governing body in writing as to the beginning and ending dates of the 90 day statutory time period for review.

Kan. Admin. Regs. § 5-44-3

Authorized by and implementing K.S.A. 12-766; effective, T-5-12-30-91, Jan. 1, 1992; effective Feb. 17, 1992.