Current through Register Vol. 43, No. 49, December 5, 2024
Section 28-45-30 - Brine pond decommissioning and abandonment(a) Each permittee that wants to decommission and abandon a brine pond shall submit a closure plan to the department at least six months before decommissioning. Decommissioning shall not begin until the secretary has issued approval.(b) Each permittee shall include at a minimum the following information in the closure plan: (1) The procedure for deactivating the various brine lines associated with the facility;(2) the procedures for conducting vertical sampling of the soils beneath the brine pond liner, including the bottom of the brine pond and the dikes;(3) the procedure to test the groundwater beneath and around the brine pond;(4) the procedures for the remediation, removal, or disposal of brine, accumulated sludge in the brine pond, contaminated soils, and contaminated groundwater;(5) a description regarding the proposed maintenance, deactivation, conversion, or demolition of the brine pond structure, including disposal of each brine pond liner; and(6) the procedures addressing the plugging of any water well or monitoring well associated with the brine pond.(c) Each permittee shall submit a final closure report within 90 days of decommissioning completion.Kan. Admin. Regs. § 28-45-30
Authorized by and implementing K.S.A. 2022 Supp. 55-1,117; effective, T-28-4-1-03, April 1, 2003; effective Aug. 8, 2003; revoked by Kansas Register Volume 43, No. 30; effective 8/9/2024.