Kan. Admin. Regs. § 28-30-201

Current through Register Vol. 43, No. 49, December 5, 2024
Section 28-30-201 - Plugging operations; notification; report
(a) All plugging operations shall be supervised by one of the following:
(1) A water well contractor licensed by the department;
(2) a licensed professional engineer or licensed geologist; or
(3) the water well or borehole owner, or the landowner of the property on which the water well or borehole is located.
(b) Each water well or borehole owner, or the landowner of the property on which the water well or borehole is located, shall notify the district within 48 hours before any plugging operations occur.
(c) Within 30 days after the plugging operation is completed, one of the following requirements shall be met:
(1) The water well contractor, licensed professional engineer, or licensed geologist that supervised the water well or borehole plugging operations shall submit a completed report of the work on the department's plugging record form WWC-5P or WWC-5 to the department, the district, and the landowner.
(2) The water well or borehole owner, or the landowner of the property on which the water well or borehole is located, shall submit a completed report of the work on the department's plugging record form WWC-5P or WWC-5 to the department and the district.

Kan. Admin. Regs. § 28-30-201

Authorized by and implementing K.S.A. 2004 Supp. 82a-1028 and K.S.A. 82a-1213; effective Sept. 30, 2005.