Kan. Admin. Regs. § 28-16-118

Current through Register Vol. 43, No. 49, December 5, 2024
Section 28-16-118 - Project eligibility
(a) In order to receive a loan, each sewerage facility equivalency project shall comply or be consistent with:
(1) The best practicable waste treatment technology requirements defined in K.A.R. 28-16-110(a);
(2) The facilities planning process defined in K.A.R. 28-16-110(e);
(3) The type of projects described in K.A.R. 28-16-119;
(4) The alternative ultimate waste disposal procedure described in K.A.R. 28-16-120;
(5) The infiltration and inflow requirements described in K.A.R. 28-16-121;
(6) The alternative and innovative treatment provisions described in K.A.R. 28-16-122;
(7) The open space recreation requirement described in K.A.R. 28-16-123;
(8) The capital improvement plan described in K.A.R. 28-16-124; and
(9) The water quality management plan described in K.A.R. 28-16-125.
(b) In order to receive a loan, each nonpoint source pollution control equivalency project shall comply or be consistent with the nonpoint source pollution control management plan described in K.A.R. 28-16-126.

Kan. Admin. Regs. § 28-16-118

Authorized by and implementing K.S.A. 1988 Supp. 65-3323; effective May 29, 1989.