Section 11-4-8 - Procedures
(a) Each engineering plan submitted to the chief engineer shall reflect economical design and shall conform to or exceed the construction requirements of the chief engineer.
(b) Each sponsor shall have acquired fee simple title or any other estate or interest in the site of the project, including all necessary easements and rights-of-ways, to ensure undisturbed use and possession for the purpose of construction, operation, and maintenance for the life of the project.
(c) Standard bid procedures of the department of administration shall be used in the bidding process for construction projects.
(d) Standard bid procedures of the department of administration and the bid procedures of the commission shall be used in the bidding process for renovation projects.
(e) The sponsor shall maintain adequate accounting and fiscal records to reflect the receipt and expenditure of all funds on the project.
(f) The sponsor shall submit relevant documents and information as required by the commission.
(g) The sponsor shall ensure that a bid bond and a performance bond are secured by the contractor.
(h) The sponsor shall complete the project in accordance with the application, plans, specifications, and any modifications approved by the chief engineer.

Kan. Admin. Regs. § 11-4-8

Authorized by K.S.A. 2005 Supp. 82a-1602 and K.S.A. 82a-1607; implementing K.S.A. 2005 Supp. 82a-1604, 82a-1605, and 82a-1606 and K.S.A. 82a-1607; effective, T-86-43, Dec. 18, 1985; effective May 1, 1986; amended May 1, 1987; amended Sept. 22, 2006.