Kan. Admin. Regs. § 11-4-1

Current through Register Vol. 43, No. 49, December 5, 2024
Section 11-4-1 - Definitions
(a) "Authorized representative" means the individual designated by the sponsor to be responsible for all correspondence. The authorized representative shall be the point of contact for the proposed project.
(b) "Bathymetric survey" means a survey recording the water depth of a reservoir at various points.
(c) "Commission" means the state conservation commission.
(d) "Cost-share limit" means the limitation of state funds as established by statute for class I, class II, and class III projects.
(e) "Land treatment" means a structure or conservation practice that shall constitute a viable method of erosion abatement or sediment and pollution control.
(f) "Phase I letter of interest" means an initial written request from a sponsor for a determination of whether a proposed project is eligible for funding.
(g) "Phase II letter of intent" means a letter providing the necessary information for establishing the funds required for a proposed project. Project plans, budgets, and schedules shall be developed in sufficient detail to support the funding request. An approved general plan, which shall be submitted with the letter of intent, shall supply detailed information to allow comparison with other projects. The signed letter of intent and supporting documentation shall be reviewed by the state water-related agencies. An order of priority for the proposed projects shall be established from the information provided in the letter of intent and recommendations from the reviewing agencies.
(h) "Phase III application" means the application for the appropriated funds for a project. This term shall include construction documents including technical specifications, contract documents, bidding plans and procedures, and documentation showing that all required permits, titles, or options on the necessary lands and easements have been obtained.
(i) "Program" means the multipurpose small lakes program.
(j) "Project" means construction or renovation of a multipurpose small lake structure by the sponsor, including acquisition of land rights and installation of land treatment structures, dams, and recreation facilities.
(k) "Renovation," as defined in K.S.A. 82a-1603 and amendments thereto, shall include the act of restoring an existing structure to safe and efficient functioning for the original purpose or for a new purpose.
(l) "Renovation plan" means a plan that outlines the scope of work of the project and shall include the following:
(1) A benefit and cost analysis;
(2) documentation of how the renovation will return the structure to its original purpose or a new purpose; and
(3) basic construction and hydrologic data for planning purposes.

Kan. Admin. Regs. § 11-4-1

Authorized by and implementing K.S.A. 2005 Supp. 82a-1602; effective, T-86-43, Dec. 18, 1985; effective May 1, 1986; amended May 1, 1987; amended Sept. 22, 2006.