Iowa Admin. Code r. 571-17.11

Current through Register Vol. 47, No. 11, December 11, 2024
Rule 571-17.11 - Sand and gravel permits

This rule provides the procedures for obtaining a permit for removal of sand and gravel from state-owned lands and waters under the jurisdiction of the department and the rules associated with the holding of a permit.

(1)Permit applications. Applications for permits must be accompanied by an application for a sovereign lands permit pursuant to 571-Chapter 13. Applications will be accepted at any time throughout the year. The permit for sand and gravel will run concurrently with the sovereign lands permit. If more than one application for a permit site is received, issuance will be determined by written sealed bids. Bids shall be based on royalty rates. Bids submitted with a royalty rate less than the current rate will not be accepted. The permit shall be issued to the applicant submitting the highest royalty rate bid.
(2)Application fee. The applicant for a sand and gravel permit shall submit a fee of $100 for the cost of inspection and issuance of each permit.
(3)Insurance. Prior to issuance of permits, approved applicants shall provide the department a certificate of insurance, covering the entire permit term, to jointly and severally indemnify and hold harmless the state of Iowa and its agencies, officials, and employees from and against all liability, loss, damage or expense that may arise in consequence of issuance of the permit.
(4)Surety bonds. Prior to issuance of permits, approved applicants shall provide to the department a surety bond in the amount of $5,000 covering the term of the permit. The surety bond shall guarantee payment to the state of Iowa for all material removed under the permit within 60 days after expiration of the permit, unless the permit holder renews the permit within 30 days of said expiration date, and for the recovery of any costs associated with reclamation or other environmental mitigation required as a condition of issued permits.
(5)Permit conditions and operating procedures. The following shall apply to all sand and gravel permits:
a. Permits require a sovereign lands permit and will run concurrently with that sovereign lands permit.
b. The size and configuration of permit sites shall be as designated by the director. The maximum continuous length of a river or stream covered by each permit shall be 4,500 lineal feet.
c. Removal operations authorized by permits shall not be performed within 30 feet of the existing bank or breach the bank at any location along any lake, stream or river unless written permission is obtained from the director prior to performance of such operations.
d. Removal operations authorized by permits shall not obstruct the flow of water to the extent of preventing its ultimate passage to its usual course below the lands and waters covered by the permits and shall not prevent movement of watercraft through such waters.
e. All equipment at permit sites that is on the surface of water or above or under the water shall be marked to be visible 24 hours per day. Any structure or other device below the water must be marked to indicate to watercraft operators where safe passage may occur. All markings shall conform to the uniform waterway marking system and be provided and installed by permit holders.
f. Permit sites may be inspected by the director at any time during the permit term in order to verify compliance with permit terms and conditions, or thereafter until final payment is made under a terminated permit. Permit holders shall keep a daily record of the amount of material removed in the manner described by the director. All such records shall be open to inspection by the director at all times.
g. Permit holders shall furnish an itemized statement of material removal operations to the director within ten days after the last day of each calendar month. Statements shall also be filed in months when no materials are removed. Reporting procedures may be modified on a case-by-case basis at the discretion of the director, to accommodate differences in material removal or operation methods. However, reporting periods shall not be greater than one-month intervals. Permit holders shall notify the department ten days prior to the initial start of removal operations or whenever the previous monthly statement indicated no materials were removed. Each cubic yard of sand, gravel, and stone removed under permits shall be considered to weigh 3,000 pounds. Statements shall be submitted on forms furnished by the department and shall indicate the following:
(1) Hours of removal operations performed each day on lands and waters covered by the permit.
(2) Tons of material removed from the lands and waters covered by the permit each day.
(3) Tons of material, from all sources, stockpiled at the operations site at the end of the month.
h. Royalty payments. Permit holders shall make royalty payments on a monthly basis for all material removed from permit sites within ten days after the last day of each calendar month. Monthly royalty payments shall be calculated using the tonnage of material removed as reported on the monthly statement. The royalty rate shall be $0.2500 cents per ton or the rate determined by sealed bids.

Iowa Admin. Code r. 571-17.11

Adopted by IAB May 1, 2024/Volume XLVI, Number 22, effective 6/5/2024