The siting authority shall use the following criteria in selecting sites for facilities.
Table 1 | |||||
Value Assigned | |||||
5 points | 2 points | Excluded | |||
Mineral and Energy Resources | No significance present within one mile | Significant presence with perpetual ban on recovery | |||
Drinking Water Sources | No sources within one mile | Source permanently closed and alternative water source provided | - | ||
Critical Wildlife Habitats | No habitat within one mile | Permanent buffer and no interference | Interference | ||
Conservation Areas | No area within one mile | Permanent buffer and no interference | Interference | ||
Cultural Areas | No area within one mile | Permanent buffer and no interference | Interference | ||
Population Areas | No area within one mile | Permanent buffer and no interference | Interference | ||
Prime Farmland | Less than 25% prime farmland | More than 25% prime farmland | - | ||
Nonattainment With NAAQS | No significant impact predicted | Little significant impact predicted | - | ||
Prevention of Significant Deterioration | Good data available and sufficient increments | Little data available but increment available | - | ||
Transportation Routes | Within 5 miles of major highway, 10 miles of a rail line, and 50 miles of interstate highway | Beyond 5 miles from major highway, 10 miles of a rail line, or 50 miles from interstate highway | |||
Proximity to Major Generators | Within 50 miles of major generators | Beyond 50 miles from generators | - | ||
Utilities and Services | Accessible services available | Sites needing services extended | - |
Iowa Admin. Code r. 567-152.3