Iowa Admin. Code r. 567-67.6

Current through Register Vol. 47, No. 8, October 30, 2024
Rule 567-67.6 - Permit requirements

Prior to any land application of sewage sludge, a permit must be obtained by the sewage sludge generator in accordance with the following requirements:

(1) The permit for the land application of sewage sludge produced by a wastewater treatment facility that has been issued a construction permit from the department will be issued concurrently and as part of a state operation permit or NPDES permit. The issuance process and permit terms will be the same as that specified for NPDES permits in 567-Chapter 64.
(2) The department will review, on a case-by-case basis, requests for a permit to land apply sewage sludge or any material derived from sewage sludge if the sewage sludge is produced outside of the state of Iowa or produced by a wastewater treatment plant that has not been issued a construction permit from the department.

Iowa Admin. Code r. 567-67.6

Amended by IAB February 9, 2022/Volume XLIV, Number 16, effective 3/16/2022