Authority: IC 7.1-2-3-7; IC 7.1-7-3-3
Affected: IC 7.1-7
Sec. 11.
Permit violations proceedings for e-liquid manufacturing permits shall be conducted pursuant to 905 IAC 1-37-1.
905 IAC 1-48-11
Authority: IC 7.1-2-3-7; IC 7.1-7-3-3
Affected: IC 7.1-7
Sec. 11.
Permit violations proceedings for e-liquid manufacturing permits shall be conducted pursuant to 905 IAC 1-37-1.
905 IAC 1-48-11