860 Ind. Admin. Code 1-3-1.1

Current through October 31, 2024
Section 860 IAC 1-3-1.1 - Examination; plumbing contractor

Authority: IC 25-28.5-1-8; IC 25-28.5-1-38

Affected: IC 25-28.5-1

Sec. 1.1.

(a) An applicant for the plumbing contractor license must pass the examination required under this section.
(b) The plumbing contractor examination shall be multiple choice.
(c) An individual must obtain a passing score on the multiple-choice examination.

860 IAC 1-3-1.1

Indiana Plumbing Commission; 860 IAC 1-3-1.1; filed Sep 8, 1992, 5:00 p.m.: 16 IR 62, eff Oct 1, 1992 [IC 4-22-2-36 suspends the effectiveness of a rule document for thirty (30) days after filing with the secretary of state. LSA Document #92-91 was filed Sep 8, 1992.]; readopted filed May 29, 2001, 10:00 a.m.: 24 IR 3237; readopted filed Jul 19, 2007, 12:57 p.m.: 20070808-IR-860070061RFA; filed Nov 26, 2008, 12:38 p.m.: 20081217-IR-860080538FRA, eff Jan 1, 2009
Readopted filed 11/13/2015, 11:09 a.m.: 20151209-IR-860150226RFA
Readopted filed 11/26/2019, 3:46 p.m.: 20191225-IR-860190189RFA
Readopted filed 1/17/2024, 5:34 p.m.: 20240214-IR-860230763RFA