80 Ind. Admin. Code 8-5-1

Current through December 4, 2024
Section 80 IAC 8-5-1 - Prohibited contracts

Authority: IC 15-13-2-9

Affected: IC 15-13-2

Sec. 1.

Any type of contract not otherwise prohibited by law, except a cost plus a percentage of cost contract, may be used; however, a firm fixed price contract is preferred. Any other type of contract may be used only when the executive director determines that it is in the commission's best interest.

80 IAC 8-5-1

State Fair Commission; 80 IAC 8-5-1; filed 11/7/2016, 3:46 p.m.: 20161207-IR-080160210FRA
Readopted filed 11/15/2022, 10:12 a.m.: 20221214-IR-080220291RFA