Sec. 6.
The design and construction of rails, where used, must be approved by the commission prior to the first race meeting at the track. Where rails are not used, the placement and design of the markings of the inside of the track are subject to the approval of the commission.
Indiana Horse Racing Commission; 71 IAC 4-3-6; emergency rule filed Feb 10, 1994, 9:20 a.m.: 17 IR 1136; readopted filed Oct 30, 2001, 11:50 a.m.: 25 IR 899; readopted filed Mar 23, 2007, 11:31 a.m.: 20070404-IR-071070030RFA; readopted filed November 26, 2013, 11:25 a.m.: 20131225-IR-071130345RFAReadopted filed 8/28/2019, 1:23 p.m.: 20190925-IR-071190319RFAReadopted filed 8/3/2023, 12:49 p.m.: 20230830-IR-071230428RFA