355 Ind. Admin. Code 2-5-7

Current through December 4, 2024
Section 355 IAC 2-5-7 - Soil liners

Authority: IC 15-16-2-44

Affected: IC 15-16-2

Sec. 7.

The surface soil shall be sealed, including the berm of an earthen dike, with a sealing agent such as sodium bentonite, attapulgite, or a similar cohesive material (clay). The liner shall be constructed in accordance with reliable engineering recommendations to establish a barrier layer that results in a downward water movement of not greater than one-millionth of a centimeter per second (1.0 × 10-6 cm/sec) at construction and maintained at one hundred thousandth of a centimeter per second (1.0 × 10-5 cm/sec) with a thickness of not less than six (6) inches. The liner shall be protected based upon reliable engineering practices to maintain its integrity and performance. If heavy mechanized equipment is to be moved over the walls or floor liner, protection to the secondary containment shall be provided.

355 IAC 2-5-7

State Chemist of the State of Indiana; 355 IAC 2-5-7; filed Mar 8, 1991, 2:45 p.m.: 14 IR 1396, eff one hundred twenty (120) days after filing with secretary of state; filed Apr 23, 1998, 9:20 a.m.: 21 IR 3363, eff one hundred twenty (120) days after filing with secretary of state; readopted filed Jun 20, 2001, 3:20 p.m.: 24 IR 3822; readopted filed Apr 27, 2007, 2:03 p.m.: 20070509-IR-355070039RFA; readopted filed Nov 13, 2013, 10:42 a.m.: 20131211-IR-355130442RFA
Readopted filed 9/19/2019, 11:20 a.m.: 20191016-IR-355190392RFA