Authority: IC 13-14-8; IC 13-19-3; IC 13-23-13-7; IC 13-24-1; IC 13-25-4-7
Affected: IC 13-25-4
Sec. 1.
Upon the completion of remediation at a site as determined by the commissioner, the commissioner will provide a no further action letter to the:
Sites that are issued a no further action letter will no longer have a priority ranking.
329 IAC 7.1-7-1