329 Ind. Admin. Code 11-2-29.7

Current through December 4, 2024
Section 329 IAC 11-2-29.7 - "Post-closure cost estimate" defined

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 25-31; IC 36-9-30

Sec. 29.7.

"Post-closure cost estimate" means the original or most recently submitted written estimate, in current dollars, of the total cost of post-closure monitoring and maintenance of the facility during the entire post-closure care period in accordance with the post-closure plan.

329 IAC 11-2-29.7

Solid Waste Management Board; 329 IAC 11-2-29.7; filed Jun 28, 2010, 2:11 p.m.: 20100728-IR-329060070FRA
Readopted filed Jun 6, 2016, 11:52 a.m.: 20160706-IR-329160144BFA