Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 2.
Before beginning operation, a solid waste processing facility must complete the initial facility development outlined in the permitted plans and specifications. Initial facility development includes the following:
(1) Construction of buildings or structures and on-site roads.(2) Installation of equipment for storage, processing, and handling of solid waste.(3) Installation of the following: (D) Communication devices.(4) Financial assurance must be established under 329 IAC 11-16 for the solid waste processing facility.Solid Waste Management Board; 329 IAC 11-12-2; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1941; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA; filed Jun 28, 2010, 2:11 p.m.: 20100728-IR-329060070FRAReadopted filed Jun 6, 2016, 11:52 a.m.: 20160706-IR-329160144BFA