TABLE 1
Soil Liner Material: Minimum Testing Frequencies Prior to Liner Construction | |
Item Tested | Minimum Frequency |
Grain size | Every 5,000 cubic yards or soil material change |
Moisture | Every 5,000 cubic yards or soil material change |
Atterberg limits (liquid limit and plasticity index) | Every 5,000 cubic yards or soil material change |
Moisture-density curve | Every 5,000 cubic yards or soil material change |
Lab hydraulic conductivity (remolded samples) | Every 10,000 cubic yards |
TABLE 2
Soil Liner Material: Minimum Testing Frequencies During Liner Construction | |
Item Tested | Minimum Frequency |
Density (nuclear or sand cone) | 5 tests per acre per lift, evenly distributed |
Moisture content | 5 tests per acre per lift, evenly distributed |
Undisturbed hydraulic conductivity | 1 test per acre per lift |
Dry density (undisturbed sample) | 1 test per acre per lift |
Moisture content (undisturbed sample) | 1 test per acre per lift |
Atterberg limits (liquid limit and plasticity index) | 1 test per acre per lift |
Grain size (to the 2 micron particle size) | 1 test per acre per lift |
Moisture-density curve | Every 5,000 cubic yards and all changes in material |
329 IAC 10-17-5