Authority: IC 13-14-8-7; IC 13-15; IC 13-16; IC 13-19-3
Affected: IC 13-20-1; IC 13-21-5; IC 36-9-30
Sec. 8.
Fee | |
Construction/Demolition Site | $20,000 |
Restricted Waste | |
Type I | $31,000 |
Type II | $31,000 |
Type III | $20,000 |
Incinerator | $28,650 |
Municipal or Nonmunicipal Solid Waste Landfill | $53,975 |
Permit Renewal | |
Construction/Demolition Site | $12,330 |
Restricted Waste | |
Type I | $26,500 |
Type II | $26,500 |
Type III | $12,330 |
Incinerator | $10,175 |
Municipal or Nonmunicipal Solid Waste Landfill | $26,500 |
Minor Modification | |
Minor Modification | $4,300 |
Annual Operation Fees | |
Fee | |
Municipal or Nonmunicipal Solid Waste Landfill | |
Greater than 500 Tons Per Day (TPD) | $45,000 |
250-499 TPD | $25,900 |
100-249 TPD | $12,070 |
Less than 100 TPD | $3,450 |
Construction\Demolition Site | $2,590 |
Restricted Waste Site | |
Type I | $41,250 |
Type II | $35,000 |
Type III | $15,000 |
Incinerator | |
Greater than 500 TPD | $40,000 |
250-499 TPD | $15,000 |
100-249 TPD | $7,000 |
Less than 100 TPD | $2,000 |
Infectious Waste Incinerator (Greater than 7 TPD) | $5,000 |
Groundwater Compliance Sampling (per well) | $400 |
329 IAC 10-11-8